Your position: HOME > NEWS >

NEWS

  • Hot tap & line stop on circulating water pipeline in SIN2016-06-24
    Project name : Hot tap line stop on circulating water pipeline in SINOPEC Jinling branch Project site: Nanjing city, Jiangsu Province Construction time: Jun, 2016 Scope of work: 1. Double hot... Read more >
  • 2014 CIPPE E32902014-03-11
    ... Read more >
  • Line Stopping2014-02-25
    Line Stops, sometimes called Stoppling or line pluggingstart with a hot tap, but are intended to stop the flow in the pipe. Line Stops are of necessity, somewhat more complicated than normal ... Read more >
  • Line Stop setup2014-02-25
    The Line Stop Setup includes: 1. Cylinder stopple method: the hot tap machine,cylinder plugging machine, hydraulic power uint,completion machine,wafervalve, four-way tee(stopple fitting), exp... Read more >
  • China International Pipeline Exhibition & Conferen2014-02-24
    China International PipelineExhibition(Interpipe) is an international professional exhibition for oil and gas pipeline equipment and construction technologies. The biennial event has been suc... Read more >
  • What is a Hot Tap and why it is made?2014-02-24
    Hot Taps or Hot Tapping is the ability to safely tie into a pressurized system, by drilling or cutting, while it is on stream and under pressure. Typical connections consist: Tapping fittings... Read more >
  • Remarks before made a Hot Tap2014-02-24
    A hot tap shall not be considered a routine procedure, but shall be used only when there is no practical alternative. Hot Taps shall be installed by trained and experienced crews. It should b... Read more >
  • Hot Tap operation2014-02-24
    The Hot Tap is made in one continuous process, the machine is started, and the cut continues, until the cutter passes through the pipe wall, resulting in the removal of a section of pipe, kno... Read more >
  • Exhibition Invitation2014-02-24
    Dear Sirs/Madam: We hereby sincerely invite you and your company representatives to visit our booth No. B114 at The 8th China International Pipeline Exhibition Langfang. China from Sep. 12 th... Read more >
  • 19条记录

Case

Pipeline reroute project at Xi Hua village, Nanan City

Contact Us

Contact: Jessica Huang
Tel:0086-790-6860686 / 18870285586
E-mail: sales@xyfhgd.com
URL: www.xyfhgd.com
Address: No.111, Tantang Road, the New Advanced Technology Development Dist, Xinyu City, Jiangxi Province, China 338004
Member Service
有事点这里
有事点这里